Bulk excavation estimator - metric

Length and depth values should be represented by meters or portions of.

Excavation and haul information

Job name:

Predetermined quantity (cubic meters):
(Leave the next 5 fields
empty if you use
this field.)

Width of excavation (meters):

Length of excavation (meters):

Depth of excavation (meters):

Slope of banks (portion of meter/1):

Slope begin point (meters):

Percent of rock (if any):

Expansion of fill factor (%):

Expansion of rock factor (%):

Cubic meter blasting cost:

Loose cubic meters per load:

Metric tons per load:

Fill dump fee or credit (use negative number for credit) per load:

Apply fill dump / credit fee to %:

Rock dump fee or credit (use negative number for credit) per load:

Apply rock dump / credit fee to %:

Truck rate per hour:

Round trip time (minutes):

Loads per hour from excavator:

Excavator Hourly Rate:

Hours loading per day:

Dense fill weight per cubic meter:

Solid rock weight per cubic meter:

While expected to be accurate, there are circumstances where the amounts calculated here will not be the actual total number. This tool is meant to provide estimates only.