Bulk excavation estimator - standard

Length and depth values should be represented by feet

Excavation and haul information

Job name:

Predetermined quantity (cubic yards):
(Leave the next 5 fields
empty if you use
this field.)

Width of excavation (feet):

Length of excavation (feet):

Depth of excavation (feet):

Slope of banks (portion of foot/1):

Slope begin point (feet):

Percent of rock (if any):

Expansion of fill factor (%):

Expansion of rock factor (%):

Cubic yard blasting cost:

Loose cubic yards per load:

Tons per load:

Fill dump fee or credit (use negative number for credit) per load:

Apply fill dump / credit fee to %:

Rock dump fee or credit (use negative number for credit) per load:

Apply rock dump / credit fee to %:

Truck rate per hour:

Round trip time (minutes):

Loads per hour from excavator:

Excavator Hourly Rate:

Hours loading per day:

Dense fill weight per cubic yard (tons or portion of):

Solid rock weight per cubic yard:

This tool is meant to provide estimates only, your results may vary.